Our Process

Simplifying Your ADU Journey

20 Minutes

Talk to us

Talk to us about your vision with our ADU specialist. Learn more about who our company is, what we have to offer and why we are the #1 ADU Builder in California. We will discuss pricing, process, financing, and your personal project.

20 Minutes

Talk to us

60 Minutes

Site Assessment

The first step in getting started with your project is to schedule a site visit. Our ADU specialist will inspect your property, and will include specific analysis of local jurisdiction requirements, set-backs to property lines, utility hook-ups, access, and site preparation.

60 Minutes

Site Assessment

1 Week

Receive an Estimate

You will be sent a formalized quote of your project cost. The quote will be based on the scope of work that is needed for the completion of your project as well as retrofitting to your property. It will contain a breakdown of what is included, the contract terms as well as a payment schedule.

1 Week

Receive an Estimate

45 Minutes

Showroom Tour

Come see the quality that is provided in your build. They look better in person than on the screen. With 4 packages built out showcasing different styles, esthetics, and material you’re able to see exactly what you’re paying for.

45 Minutes

Showroom Tour

1 Week

Signing the Contract

Our team will work with you on reviewing the details of the contract. We make sure that you are aware of the terms and conditions and are informed of the entire process. Our goal is to make you feel comfortable in signing.

1 Week

Signing the Contract

1 Day

Pay the Deposit

Once the contract is signed a deposit request of $1,000 will be sent. When the deposit is paid your contract is locked in and we can officially start on your project. A pre-construction manager will be assigned to you.

1 Day

Pay the Deposit

5 Weeks

Architectural Design Phase

Our pre-construction team will guide you through creating your floor plan. An initial floor plan design will be provided which from there revisions can be made. Your manager will be coordinating with our architect and engineer to get your plans finalized and to create a permitting package for submission.

5 Weeks

Architectural Design Phase

12 Weeks

Permit Process

Your plans will be submitted to your city or county jurisdiction for approval. Approval is needed from various departments within your jurisdiction in order for the permits to be issued.

12 Weeks

Permit Process

1 Day

Interior Design

Near the approval date for your permits you will be introduced to our designer who will help create your design packaging. They’ll go over the different packages that we offer that include different color schematics as well as different esthetics.

1 Day

Interior Design

12 Weeks

Site Preparation and Construction

A construction project manager will be assigned to you for the duration of the construction phase. The site preparation process begins once all permits have been issued. The project starts with grading and utilities and is followed by foundation and framing. An inspector verifies that all parts of your build are up to code. Final inspection verifies the completion of your entire project.

12 Weeks

Site Preparation and Construction

2 Weeks

Hand Off

Our team completes all finishing touches making sure that your ADU is ready for you. Once the unit is wrapped up and cleaned we officially hand off the ADU to you. Whether it's a rental asset, for retiring parents or extra living space we hope that your ADU serves you well. We’re excited to bring your vision to life!

2 Weeks

Hand Off

At IMKAT Homes, we believe in making your Accessory Dwelling Unit (ADU) project as seamless and stress-free as possible. Our process begins with a thorough consultation to understand your needs and goals. From there, we develop a custom design that suits your space and budget, followed by securing the necessary permits. Once approved, our experienced team handles the construction, ensuring top-quality craftsmanship and attention to detail. Finally, we add the finishing touches, delivering a fully functional ADU ready for use. Throughout the journey, we keep you informed and involved, providing transparency and peace of mind at every step.

Get A Quick Estimate

Get A Quick Estimate

Get $5,000 Off Your ADU Build before the end of the year

Days
Hours
Minutes
Seconds